The construction industry is considered as one of the industries with lower yields, frequent delays and reprogramming. Due to this and to avoid losses of time, costs and inconveniences in the execution, the virtual construction is used, that allows to analyze previously the constructive sequences and the possible interferences between the different activities through a real time scenary according to the programmed schedule . This article shows the implementation of BIM technology in a modular housing development in Venezuela. Four 4D simulations were carried out, two initially due to the original planning and its timely improvement, and two subsequent corresponding to reprogramming due to actual delays in execution due to lack of concrete supply. The main results were: problems of programming logic, interferences between activities, unreal sequences, among others in the first models. As for the models of the reprogramming gave resulting times very similar to reality; This means that the models work both in ideal situations and in situations of uncertainty. Building information modeling solutions introduce a new way of working, based on the creation and use of coherent and coordinated information, wich allows for faster decision making, better documentation and the possibility of predicting the drawbacks Even before the work began.
[1] E. Rodríguez, BIM-4D: “El tiempo añadido al modelado de información de construcción”. [Revista en Línea]// www.fierasdelaingenieria.com. Enero, 2012
[2] C. Martínez y M. Martínez. “Simulación de procesos constructivos utilizando tecnología 4D (Caso: Obra Parque la música Residencial)”. Trabajo especial de grado para optar al título de Ingeniero Civil. Barquisimeto, Venezuela: Universidad Centroccidental Lisandro Alvarado. (UCLA), 2009.
[3] J. R. Oropeza. “Evaluación la trazabilidad óptima de un proyecto de construcción de 50 viviendas multifamiliares, mediante modelos de simulación con tecnología 4D, proponiendo estrategias de control y seguimiento que soporten la toma de decisiones”. Trabajo especial de grado para optar al título de Ingeniero Civil. Barquisimeto, Venezuela: Universidad Centroccidental Lisandro Alvarado (UCLA). 2012.
[4] W. Kymmel. Building Information Modeling, Planning and Managing Construction Projects with 4D Cads and Simulations. McGraw-Hill Construction Series, 2008.
[5] J. Kunz, M. Fischer. "Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions". CIFE Working Paper, 97, Version 14, 50, 2012. Disponibleen: http://www.stanford.edu/group/CIFE/online.publications/WP097.pdf.
[6] BIMFORUM Forum Chile, Disponibleen: http://www.bimforum.cl/
[7] R. O. Saldias. “Estimación de los beneficios de realizar una coordinación digital de proyectos con tecnologías BIM”. Santiago de Chile, Universidad de Chile, 2010.
[8] AUTODESK, “Manual del Usuario. Autodesk Navisworks Simulate 2012, 2011. http://download.autodesk.com/us/support/files/autodesk_navisworks_simulate_2012_user_guide_esp.pdf
Published on 01/01/2017
Licence: CC BY-NC-SA license
Are you one of the authors of this document?